The relevance of wind energy for the German energy supply increases steadily. This development is driven by the German withdrawal from nuclear energy as well as the ambitious climate policy goals. Furthermore, the fossil energy resources are limited. The logistic network which is needed to create an offshore-wind park is affected by dynamic disturbances like weather conditions as well as other influences. They have an impact on the material-pull which is initiated by the offshore construction site. Already scheduled processes cannot be proceeded which necessitates rescheduling of material flow process-plans. Sometimes material is also pushed back into the network.