Agile Project Management with Scrum

Challenges Involved in Delivering Product Increments

JournalIndustrie 4.0 Management
Issue Volume 36, 2020, Edition 3, Pages 29-32
Share Cite Download

Abstract

In Scrum projects self-organized teams develop software products in an iterative process. A major advantage of this approach is that the project becomes more flexible. For example, the project team can react very quickly if new requirements are discussed during the project. Another advantage is the possibility to deliver product increments on a regular base instead of having to wait until the end of the project. The aim of this article is to discuss challenges that must be overcome when these regular increments are moved into the production environment.

Keywords

Access limited

You are currently not logged in / not yet registered.

In order to download the desired file(s), you must be logged in and have an appropriate inclusive subscription. Alternatively, you can also obtain access by paying a one-off fee.

Subscription included Purchase
without 29,00 €
Digital 27,55 €
Expert 26,10 €
Professional 0,00 €

Download for one time 29,00 €

All prices include 7% VAT

After purchasing access rights, you will automatically be redirected back to this page.