In order to meet the demands of a more flexible supply of small lot sizes, many companies use in-plant milk-run systems. Despite the increasing distribution of milk-runs, a standard has not been established yet and the planning is often carried out without a suitable methodology. Therefore, a methodology was developed that supports the integrated design of the technology, the process and the controlling of an in-plant milk-run system as well as an integrated evaluation of alternatives.