A Heuristic Approach for the Machine Scheduling Problem in a Hot Rolling Mill

JournalIndustrie Management
Issue Volume 25, 2009, Edition 3, Pages 49-52
Share Cite Download

Abstract

The continuously growing cost pressure, individual production orders as well as decreasing innovation cycles are only a few characteristics of the vital structural change that the production industry has been confronted with during the past years. In order to stand out against the competitors and to gain an advantage in competition, an enterprise has to have the ability to adjust to the dynamic demands of the internal and external environment. A contribution to that is a flexible control system for the material flow. This article presents a heuristic based algorithm for the hot rolling production scheduling problem of a steel manufacturer.

Keywords

Access limited

You are currently not logged in / not yet registered.

In order to download the desired file(s), you must be logged in and have an appropriate inclusive subscription. Alternatively, you can also obtain access by paying a one-off fee.

Subscription included Purchase
without 29,00 €
Digital 0,00 €
Expert 0,00 €
Professional 0,00 €

Download for one time 29,00 €

All prices include 7% VAT

After purchasing access rights, you will automatically be redirected back to this page.


Solutions: Production Control Production Planning