Skip to content
  • Subscriptions
  • Editorial Calendar
  • Media Data
  • Newsletter
  • Contact
  • German
  • Login / Register
  • Cart / 0,00 € 0
    • No products in the cart.

      Return to shop

  • Subscriptions
  • Editorial Calendar
  • Media Data
  • Newsletter
  • Contact
  • German
Industry 4.0 ScienceIndustry 4.0 Science
  • 0
    Cart

    No products in the cart.

    Return to shop

  • I4S+
  • Industry 4.0
    • Automation
    • Digital Twin
    • Factory Planning
    • Industry 4.0
    • Internet of Things
    • Lean Production
    • Sustainability
    • Manufacturing Systems
    • Adaptability
  • Artificial Intelligence
  • Functions
    • Start-up Management
    • Maintenance
    • Logistics
    • Assembly
    • Product Development
    • Production Planning
    • Production Control
    • Process Management
    • Quality Management
    • Risk Management
    • Safety
  • Tools
    • Additive Manufacturing
    • Analytics
    • Augmented Reality
    • Blockchain
    • Modularization
    • Training
    • Robotics
    • Sensors
    • Simulation
    • Software
  • Management
    • Services
    • Dynamics
    • Energy Efficiency
    • Leadership
    • Business Models
    • Innovation
    • SME
    • Management
    • Product Piracy
    • Resource Efficiency
    • Strategy
    • Profitability
  • Journal
    • Current Issue
    • Editorial Calendar
    • Editorial Board
    • Order in Print
    • All E-Journals
    • Annual Table of Contents
    • List of Reviewers
  • Information
    • Books
    • Find 4IR Consultants
    • Find Smart Factory Software
    • Find ERP Consultants
    • Find ERP Software
    • Open Access Articles
    • About GITO
  • I4S Shop
  • German

Autor: Therese Kirsch

Ramp-Up and Phase-Out-Management

Ramp-Up and Phase-Out-Management

Challenges of Logistics at the Beginning and End of the Product Life Cycle
Therese Kirsch, Wolfgang Buchholz
With time, products lose their attractiveness on the market, technology becomes outdated or customer demands are no longer met. To keep up success, companies need to replace old products. This means a huge amount of product changes for a manufacturer that differentiates through customer-focused product design and continuous product innovations. Ramp-up and phase-out-management are critical factors of success. As the product life cycles shorten due to the dynamism of the technology and markets, payback periods for the development costs reduce, too. In order to maintain profitability or to increase it, it is necessary to minimise the cost and time of product changes. This article shows how logistics contribute handling a lot of complex ramp-ups and phase-outs with optimal cost and in a short time.
Industrie Management | Volume 24 | 2008 | Edition 3 | Pages 45-48
  • About GITO
  • Factory Innovation
  • ERP Management
  • GITO Events
  • AIS Transactions on Enterprise Systems
  • Our Partners
  • FAQ for Readers
  • Cancel Subscription
  • Media Data
  • Newsletter
  • Become an Author
  • Editorial Process
  • Open Access by GITO
  • Publication Ethics
  • Contact
Visa
MasterCard
PayPal
  • Imprint
  • Cookie Policy
  • Data Privacy Policy
  • General Terms and Conditions (T&C)
Copyright 2026 © GITO
  • I4S+
  • Industry 4.0
    • Automation
    • Digital Twin
    • Factory Planning
    • Industry 4.0
    • Internet of Things
    • Lean Production
    • Sustainability
    • Manufacturing Systems
    • Adaptability
  • Artificial Intelligence
  • Functions
    • Start-up Management
    • Maintenance
    • Logistics
    • Assembly
    • Product Development
    • Production Planning
    • Production Control
    • Process Management
    • Quality Management
    • Risk Management
    • Safety
  • Tools
    • Additive Manufacturing
    • Analytics
    • Augmented Reality
    • Blockchain
    • Modularization
    • Training
    • Robotics
    • Sensors
    • Simulation
    • Software
  • Management
    • Services
    • Dynamics
    • Energy Efficiency
    • Leadership
    • Business Models
    • Innovation
    • SME
    • Management
    • Product Piracy
    • Resource Efficiency
    • Strategy
    • Profitability
  • Journal
    • Current Issue
    • Editorial Calendar
    • Editorial Board
    • Order in Print
    • All E-Journals
    • Annual Table of Contents
    • List of Reviewers
  • Information
    • Books
    • Find 4IR Consultants
    • Find Smart Factory Software
    • Find ERP Consultants
    • Find ERP Software
    • Open Access Articles
    • About GITO
  • I4S Shop
  • German
  • Login / Register
  • German