This paper describes a process oriented method for the planning of versatile production as well as logistics systems. The authors demonstrate how the necessary structures, resources and management capacities can be calculated by using a simple six step planning procedure. Due to the numerous potential applications, the holistic approach as well as the relatively basic design it is possible to file planning results sorted. In doing so, factory designers can compare them easily with new challenges emerging. In combination with permanently available simulation models the process oriented planning procedure is a significant step towards permanent planning disposition.