Autor: Michael Homuth

Ramp-Up-Forecast for Production Networks

Ramp-Up-Forecast for Production Networks

Horst Meier, Michael Homuth
Production Ramp-Ups are crucial for an industrial companies´ success. Business processes have to be controlled throughout the entire Production Network, what could be ensured by the use of modern workflow-based control methods. So far it is still questionable what should be the workflow’s goal. Looking at a ramp-up along the supply chain the process consists of a large number of local ramp-ups. For this a prognosis system will be introduced which allows an educated guess on the development of the number of pieces during the ramp-up. The prognosis is founded on a knowledge-based approach and does rely on multivariate data analysis. This will lead to a ramp-up forecast which could offer strategic aims into workflow-based network control tools.
Industrie Management | Volume 24 | 2008 | Edition 2 | Pages 63-66
SME Oriented Ramp-Up Management Within the Supply Chain

SME Oriented Ramp-Up Management Within the Supply Chain

Bernhard Zimolong, Horst Meier, Sylvia Preuss, Michael Homuth
The problems occurring during ramp-up processes of new products are usually of technical nature. They, however, feature a large-scale potential for causing or intensifying further problems in other fields of action during the project. Especially small and medium-sized companies suffer from the absence of appropriate documentation methods and proactive approaches for effective containment actions in case of conflicts. Looking at a ramp-up along the supply chain the process consists of a large number of local ramp-ups. Conventional project management methods do not offer suitable tools for this multi-level problem. A holistic ramp-up management needs to be developed.
Industrie Management | Volume 22 | 2006 | Edition 1 | Pages 35-38