Production planning and control (PPC) software schedules the availability and optimal use of human and operation resources. The system must allocate the operation steps and operation resources to the machines in the right order under the control of qualified personnel. The scheduling takes place according to customer-specific objectives such as adherence to delivery dates. These objectives compete against the cost-specific objectives such as high workload of the machines. For the cost specific objectives, the topic of resource and energy efficiency become the focus of attention.
Access limited
You are currently not logged in / not yet registered.
In order to download the desired file(s), you must be logged in and have an appropriate inclusive subscription. Alternatively, you can also obtain access by paying a one-off fee.