Today’s complexity in industrial production planning requires support by IT. In particular, Manufacturing Resources Planning (MRP) and Manufacturing Execution Systems (MES) are widely used. In some production environments these systems have disadvantages which do not allow a quick response to altered input information. Often manual production planning and control is more flexible and effective but requires adequate tools and standards. One solution has been developed and implemented for the construction of railway shunting switches and is described in this article.