Robust Time Scheduling and Capacity Planning by Scenario-based Simulation

JournalIndustrie Management
Issue Volume 26, 2010, Edition 2, Pages 45-48
Share Cite Download

Abstract

Fabrication and assembly processes - in which the manual work processes play an important role related to a high probability of errors and interruptions - can be planned with the production simulation, if the simulation approach is adapted to the robust planning method. This article shows for the example of shipbuilding, how the simulation user benefits from the scenario-based process model for the preparation and management of the simulation scenarios. Additionally a systematic evaluation method simplifies the interpretation of the simulation results in order to assess the robustness of the planning alternatives.

Access limited

You are currently not logged in / not yet registered.

In order to download the desired file(s), you must be logged in and have an appropriate inclusive subscription. Alternatively, you can also obtain access by paying a one-off fee.

Subscription included Purchase
without 29,00 €
Digital 0,00 €
Expert 0,00 €
Professional 0,00 €

Download for one time 29,00 €

All prices include 7% VAT

After purchasing access rights, you will automatically be redirected back to this page.


Solutions: Production Planning
This entry was posted in Uncategorized. Bookmark the permalink.