Foresighted Change Management

On the integration of electric, electronic and software components

JournalIndustrie Management
Issue Volume 22, 2006, Edition 6, Pages 51-54
Share Cite Download

Abstract

The foresighted management of technical changes based on the EESI-Concept is fundamental for the management of specific electric-, electronic- and software requirements. The EESI-Concept comprises three integration steps, “Create transparency”, “Anticipation instead of documentation” and “Comprehensive realization”. The concept is based on a fundamental change in product and process documentation that is the complete documentation of all relevant information and interdependencies in form of an information net. The use of information nets for example even considers the interconnection between the electronic component, the software and the required installation and testing software. The foresighted change management then uses the complete documentation to simulate and analyze future product changes before their realization.

Keywords

Access limited

You are currently not logged in / not yet registered.

In order to download the desired file(s), you must be logged in and have an appropriate inclusive subscription. Alternatively, you can also obtain access by paying a one-off fee.

Subscription included Purchase
without 29,00 €
Digital 0,00 €
Expert 0,00 €
Professional 0,00 €

Download for one time 29,00 €

All prices include 7% VAT

After purchasing access rights, you will automatically be redirected back to this page.


Solutions: Product Development